Where do you nail Weatherboards?
Category:
business and finance
construction industry
Weatherboard should be secured by driving the nail as close as possible to the lower most edge of the siding without penetrating the top (or head) of the siding board beneath. E.g.: in observing minimum recommended lap of 21mm, nail entry should be around 25mm up from butt (or lower most edge).
Likewise, how much do Weatherboards overlap?
The weatherboards used on the outside of the building are 170mm wide, the manufacturer specifications give a minimum overlap of 25mm, therefore the coverage for each board is 145mm. The 145mm overlap can be increased, if the cut over openings is too severe.
In this regard, how do you install cladding?
Cladding is available in many different types and styles.
- Step 1 - Measure Exterior Walls of Home.
- Step 2 - Complete All Sheathing.
- Step 3 - Install House Wrap and Foam Insulation.
- Step 4 - Begin Starter Row of Cladding.
- Step 5 - Overlap The Next Rows.
- Step 6 - Finish a Wall before Installing Trim and Other Items.
2-5 days