What is the goal of a work center?
Category:
business and finance
manufacturing industry
The purpose of assigningn work centers to a cost center is to known how much cost has been incurred at a cost center via the associated work centers during these operations. Cost Centers are also linked to activity type through work centers.
Keeping this in view, what is the meaning of work center?
Work center is an organization unit where manufacturing activities are performed. In other words, Work Centers are the master data which represent real machines, Production Lines, Assembly Work Center, etc.
Then, what is a work center area?
A work center is a physical or logical production area used as a unit for scheduling and routing operations. A work center may perform multiple operations, but capacity requirements are usually tracked only at the total work center level.
Creating the Work Center for the Production Line
- Starting from the SAP Easy Access menu, choose Logistics Production Master Data Work Centers Work Center Create .
- Enter the plant, the work center number and the work center category.
- Choose Enter .
- Enter the following basic data :
- Choose Enter .