What do you do first when remodeling a bathroom?
Category:
home and garden
home improvement
Steps to Remodel a Bathroom
- Remove or Demolish Bathroom Fixtures.
- Install Your New Shower or Tub Basin.
- Install New Fixtures and Features.
- Lay Down Your New Floor Tiles.
- Hang New Drywall and Start Painting.
- Install Your New Vanity and Cabinets.
- Finish Hooking Up the Plumbing.
Consequently, how do you prepare a bathroom for remodeling?
Five Things To Do To Prepare For A Bathroom Remodel
- Create a Budget.
- Determine Your Design Inspiration.
- Plan Ahead for Unique Projects.
- Choose Appropriate Surfaces.
- Give Your Hardware the Attention It Deserves.
- Make a Plan.
- Set a Budget.
- Talk to Your Insurance Agent.
- Hire a Contractor.
- Secure Permits and Order Materials.
- Start Demolition.
- Work Behind the Walls.
- Paint and Install Flooring.
Hereof, what should you not do when remodeling a bathroom?
Read on to find out the 7 most common mistakes made during a bathroom renovation and how you can avoid them in your own home.
- Ignoring the Bathroom Fan. 1/8.
- Lacking a Clear Plan.
- Improper Spacing.
- Choosing the Wrong Materials.
- Being Unrealistic About a Budget.
- Overlooking Small Mistakes.
- Losing Focus Toward the End.
- Reno Rules.
On average, a small complete bathroom remodel can be done in about 23 days under ideal circumstances. Assuming no work is done on weekends, this translates to about 4 1/2 weeks—slightly more than one month—if the work proceeds uniformly with no breaks.